The multi-family houses with a total of 6 apartments and 8 underground parking spaces are being built as KfW Efficiency House 55. The Program “KfW 55” refers to the new building level (KfW 100) minus 45% less
Primary energy per year than a comparable new building.
Two building complexes are planned.
These each have 3 residential units. House A contains 3 residential units. This
can be reached via the stairwell and an elevator. House B includes 3
Residential units that can be reached via the stairwell.
Paths and streets are covered with eco-composite paving, color gray, in accordance with the open space plan.
manufactured. In doing so, in whole or in part, according to the specifications of the development planning,
Infiltration pavement used. Depending on the altitude, there are steps in front of the front door
possible. The terrace receives a compacted gravel substructure and modern on it
Concrete blocks laid in gravel according to a sample.
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.