The A8 between the Pforzheim South and Pforzheim North junctions is the last bottleneck between Karlsruhe and Stuttgart due to the constricted lanes. The construction measure comprises the six-lane expansion of the A8 over a length of 4.722km.
IBB has been contracted to build two bridges: a flyover structure for the Sallenbuschweg over the A8, a single-span integral arch structure as a composite bridge, and the Enz Bridge over the Enz River, a three-span structure made of prestressed concrete.
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.