Tunnel Raststatt

Description

The project will involve the construction of the single-track, twin-tube Raststatt tunnel, which will be approximately 4,270 metres in length, as well as the upstream and downstream trough structures. In addition, four bridge structures will be built.

Project Details

  • Projekt: Tunnel Raststatt
  • Completion date: September 2025
  • Location: Raststatt
  • Sector: Infrastructure
  • Area: